Black Diamond M/LWD Learning Portal
Log in
Time limit: 0

Quiz Summary

0 of 10 questions completed

Questions:

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 10 questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  1. Answered
  2. Review
  1. Question 1 of 10
    1. Question

    Which of the following are purposes of drilling fluid?

    Correct

    Incorrect

  2. Question 2 of 10
    2. Question

    In the 1920’s the Baroid company pioneered the addition of which common clay to improve viscosity and carrying capacity?

    Correct

    Incorrect

  3. Question 3 of 10
    3. Question

    Which of the following statements about Water-Based Muds [WBM] are true?

    Correct

    Incorrect

  4. Question 4 of 10
    4. Question

    Which type of drilling fluid is typically subject to the strictest environmental controls?

    Correct

    Incorrect

  5. Question 5 of 10
    5. Question

    Why does the M/LWD Field Engineer need to monitor the Potassium levels in the mud report?

    Correct

    Incorrect

  6. Question 6 of 10
    6. Question

    The mud report states the Sand Content is 1%. How can the M/LWD Field Engineer confirm the value is correct?

    Correct

    Incorrect

  7. Question 7 of 10
    7. Question

    The primary method of removing Low Gravity Solids from the mud is the use of shale shakers.

    Correct

    Incorrect

  8. Question 8 of 10
    8. Question

    What is the name of the Black Diamond downhole screen which can be beneficial in the break up of clumps of LCM which could block an MWD tool?

    Correct

    Incorrect

  9. Question 9 of 10
    9. Question

    MWD tools have documented maximum acceptable concentrations of various types of LCM. For the limit to be applicable which of the following statements are true?

    Correct

    Incorrect

  10. Question 10 of 10
    10. Question

    What information should the M/LWD Field Engineer record when LCM is added to the circulation system?